Liebherr LR 1750 on the withdrawal of fishing 'Motxo'

Liebherr LR 1750 on the withdrawal of fishing 'Motxo'

Crane Liebherr LR 1750. Lift time 40 minutes. The ship weighed 184 tons. On the spot, the engineer of the operation, Kepa Kruzeta, and Patxi Usabiaga oversaw each of the movements. The ship was from the subject yesterday by four nylon slings.

Liebherr LTM 1350 crane on the station Herrera

Liebherr LTM 1350 crane on the station Herrera

The roof of the station Herrera was executed in a day less than the 4 provided. The key has been in a perfect planning and synchronization of material and human resources. The star has been a large crane Liebherr LTM 1350 Usabiaga company in which only mark the counterweights 220. tons in the scale.

Usabiaga cranes in the fifth bridge in San Sebastian

Usabiaga cranes in the fifth bridge in San Sebastian

The fifth bridge of San Sebastian is taking shape with the placement of its structure. A complex engineering operation early in the morning put the frame construction.

Usabiaga cranes in the placement of the 5 th Bridge of San Sebastian

Usabiaga cranes in the placement of the 5 th Bridge of San Sebastian

Parts of 32 meters long and 70 tons. Usabiaga special transport, at dawn. From Langreo (Asturias), waiting all morning inside the trailer, a special transport multi-axis-up placement by two large cranes.

Liebherr LR 1600 / 2 mounting beams 200 tons, Ferrovial.

Liebherr LR 1600 / 2 mounting beams 200 tons, Ferrovial.

LR 1600 Liebherr crane 600 ton crawler, 2009, ideal for installations of wind farms.
Has the property as opposed to a wheel that can scroll with load.
The crawler crane LR 1600 / 2 600 tonnes of capacity convinces with its capacities, its variable system [...]

Cranes Usabiaga in Orio

Cranes Usabiaga in Orio

Usabiaga cranes involved in the unfolding of Eusko Tren routes passing through Orio, affects to 1,635 meters of track. Includes a viaduct of 580 feet, with a view to resolving the suppression of the level crossing and avoid a wetland.

Mollet work: special transport TITAN CC2000 crane assembly

Mollet work: special transport TITAN CC2000 crane assembly

The works identified in this project, along with the installation of the proposed third lane on the ramp Papiol-Mollet, allow the use by that branch of freight and passenger trains both conventional lines as the AVE, ensuring access this branch to the new circulation of goods AVE Barcelona-French border and preventing their passage through the tunnels in the city of Barcelona.

Usabiaga cranes in the San Juan Bridge

Usabiaga cranes in the San Juan Bridge

A soft and light maneuver is relatively simple, repeated seven times, served to realize the frame of the bridge in San Juan. A pedestrian link road, Circle of Peace cemetery costs, now, it represents a tangible reality. Preparations, starting with the surface smooth [...]

LTM1500 and LTM1200 in the Guggenheim Bilbao

LTM1500 and LTM1200 in the Guggenheim Bilbao

Jobs in the Guggenheim Museum in Bilbao. Crane 200 ton and 500 ton crane with jib. Jobs at 51 m radius, up to 21 ton weight on that radio work

230-ton metal structure in the A-8, Trapagaran. Liebherr LTM 1500 and LTM 1350

230-ton metal structure in the A-8, Trapagaran. Liebherr LTM 1500 and LTM 1350

Metal structure assembly of 230 tons on the A-8 Trapagaran with LTM 1500 and LTM 1350.
In addition to install cranes provided transport Usabiaga special.