UTE Quejigares: TBM
UTE Quejigares: DRAGADOS - TECSA
Work load consisting of tunnels in the park in Valdemoro Dredging machinery, transport it back to work in Salinas (Malaga) before downloading and assembling the same.
To do this, we have made use of telescopic crane for loading and unloading both in Madrid and in work, and crawler crane LR 1400 for mounting the machine.



















Comments not currently permitted for this content.