on April 14, 2014 By admin on April 14, 2014
Removing the viaduct entrance to Bilbao from A8 by Sabino Arana. Parts up to 720 Tons.
Usabiaba Gras, Removing the viaduct 720 Tons
[...]
Posted in News , Operations crane , Uncategorized
on November 20, 2012 By admin on November 20, 2012
The Liebherr 11350 crane is moving parallel to go through a breakwater superpórtico skates equipped with 4 each for 1000Tn colocaciónde 10,000 blocks for strengthening the dam 1.8 km in length. 27 pitches and average yield gantry positioning blocks 45 blocks per day are anticipated.
Posted in News , Operations Crane
on October 31, 2012 By admin on October 31, 2012
Equipment begins to arrive Usabiaga Cranes Port of Barcelona.
Crane Liebherr LR11350 Usabiaga in building the new dock in the port of Barcelona.
Usabiaga cranes, specialist in building new ports, docks and piers, strengthening the construction of the breakwater of Port Nou in the port of wins [...]
Posted in News , Operations Crane
on May 28, 2012 By admin on May 28, 2012
Liebherr LR1600 Crane Usabiaga, the most modern crane market. 20 people, several support ships, 2 pontoons, 2 tugs and crane large lattice.
Posted in News , Operations Crane
on May 8, 2012 By admin on May 8, 2012
A large crane and two pontoons to rescue sa Maverick Turret Two and tow to Denia.
Kepa is Kruzeta engineer Cranes Usabiaga likely lead the rescue maneuver Maverick Two, which is 38 meters long, nine-sleeve and weighs 110 tons empty. The [...]
Posted in News , Operations Crane
on January 16, 2012 By admin on January 16, 2012
Thumbnail Carranza stadium visor
Cranes Usabiaga begins work to replace the visor Carranza. Powerful Liebher Crane Crane LR 11350 Usabiaga accommodate 1,350 tons handles and raise the assembled structure.
The placement of the hood and Carranza stadium is becoming a reality. It has [...]
Posted in News , Operations Crane
on December 16, 2011 By admin on December 16, 2011
In Donostia-San Sebastián three towering redwoods and dominate the landscape of Pius XII, competing in the limelight with the source and Amara Plaza hotel. For 45 years these trees have been developed in the plot of the institute last month Peñaflorida was demolished to build a new school. The controversy over the [...]
Posted in News , crane maneuvers , maneuvers transports
on August 29, 2011 By admin on August 29, 2011
12 meters is about the young whale
30 Metres
An estimated was five
Posted in News , Operations Crane
on August 5, 2011 By admin on August 5, 2011
Crane Model 11350 Liebnerr, one arm of 126 meters high dome to move 220 tons. The placement of the cover is 120 meters long and 60 meters wide is the most important moment of the entire enlargement process completed to date.
Posted in News , Operations Crane
on July 20, 2011 By admin on July 20, 2011
Following installation of the dome Buesa Arena. Crane for mounting the dome. Liebherr LR 11350 Crane Cranes preparing for crane Liebherr LR 11350: AC70 DEMAQ city, Liebherr LTM 1150 Liebherr LTM 1060y
Posted in News , Operations Crane