Liebherr 11,350: Completed installation of the dome Buesa Arena.

Liebherr 11,350: Completed installation of the dome Buesa Arena.

Completed installation of the dome Buesa Arena. Crane used to assemble the dome: Crane Liebherr LR 11350. Cranes used for the preparation of the crane Liebherr LR 11350: AC70 DEMAQ city, Liebherr LTM 1150 Liebherr LTM 1060y

LTM 1200 Liebherr cranes and Demag AC 200: Gateway Round Bay

LTM 1200 Liebherr cranes and Demag AC 200: Gateway Round Bay

Work on the assembly of two plates on the 4.7 kilometer point of the round lasted three days. And they have made through the intervention of two huge cranes of 200 tons of signature Usabiaga Cranes, feathers that supported and facilitated the joint parts between them and their engagement with the concrete structure that starts the gateway both hands

Crane Liebherr LR 11350 for the placement of the dome of Buesa Arena

Crane Liebherr LR 11350 for the placement of the dome of Buesa Arena

Crane with an arm capable of lifting 120 meters up to 1,600 tons. Due to its size, is mounted in situ. This is a structure with potential for up to 1,600 tons-dome canopy weighs just over 200 tons, consists of an arm 120 meters long and working at a height of 70 meters.

Expansion of the port of passages

Expansion of the port of passages

By placing by crane beams Usabiaga thirteen large, entering its final phase of the redevelopment of West Donibane dock at the Port of Pasajes, where there are fairing area. In the coming weeks will begin to build the new docks that give access to 163 [...]

After 5 days of transporting the giant coil reaches Amezketa

After 5 days of transporting the giant coil reaches Amezketa

100 tonnes is the weight of this huge piece of steel having dimensions of 7.40 meters high by 6.20 wide. The piece will be used to glaze and dry the paper in a paper company Amezketa.

Special Transportation coil, paper Amezketa

Special Transportation coil, paper Amezketa

Due to the nature and large size of the cylindrical part, about seven feet high, six wide and one hundred tons, the special purpose vehicle that carries no tunnel can not cross, so that the procession will pass through urban areas. Involved Cranes: Liebherr LTM 1500 Demag AC 250 and.

Liebherr LR 1750 on the withdrawal of the fishing vessel 'Motxo'

Liebherr LR 1750 on the withdrawal of the fishing vessel 'Motxo'

Crane Liebherr LR 1750. Lifting Time 40 minutes. Weighed 184 tons ship. On the spot, the engineer of the operation, Kepa Kruzeta, and Patxi Usabiaga oversaw each of the movements. The boat was the day before the subject of four nylon slings.

Liebherr LTM 1350 crane on the station Herrera

Liebherr LTM 1350 crane on the station Herrera

The roof of the station Herrera was executed in a day less than the 4 provided. The key has been a perfect planning and synchronization of material and human resources. The star has been a large crane Liebherr LTM 1350 Usabiaga company in which only mark the counterweights 220. tons on the scale.

Cranes Usabiaga in the fifth bridge in San Sebastian

Cranes Usabiaga in the fifth bridge in San Sebastian

The fifth bridge in San Sebastian takes shape with the placement of your structure. A complex engineering operation early in the morning put the frame construction.

Cranes Usabiaga in positioning the 5 th Bridge of San Sebastian

Cranes Usabiaga in positioning the 5 th Bridge of San Sebastian

Parts 32 meters long and 70 tons. Special Transportation Usabiaga, at dawn. From Langreo (Asturias), waiting all morning inside the trailer, a special transport multi-axis-up placement by two large cranes.