UTE AVE Trinity TBM assembly (12 m.)

UTE AVE Trinity TBM assembly (12 m.)

COPASA - ISOLUX CORSAN - VIAS, Herrenknecht TBM S-444 (12 meters)
The work of unloading, pre-assembly and assembly of the TBM began in September.
In September we proceeded to the discharge of the TBM S-444 from Germany.
For the download is made use of a telescopic truck crane LTM 1400 model with capacity [...]

UTE Quejigares: TBM

UTE Quejigares: TBM

UTE Quejigares: DREDGING - TECSA
Work consisting of the burden of tunneling in the park Valdemoro Dredging machinery, transport back to the same work in Salinas (Malaga) before downloading and assembling the same.
To do this, we have made use of telescopic crane for loading and unloading both in Madrid [...]

UTE Metro TBM: TBM dismantling

UTE Metro TBM: TBM dismantling

TBM UTE Metro: FCC - SCRINSER - OHL - FERROVIAL - COPISA.
Work consisting of removal of TBM in Barcelona's El Prat airport to the Metro Line 9 of that city. In this work made use of the crawler crane LR 1550.

UTE Tunnel Terrassa: TBM assembly

UTE Tunnel Terrassa: TBM assembly

FCC - OHL - COPISA, Lovat TBM 6 meters
Crane LR 1550 with a capacity of 550 tons crawler crane as principal with telescopic crane to perform the maneuvers held in the assembly.
In addition to cranes, this paper pre-assembly and assembly of TBM was made using a special truck to transport [...]

UTE Trinitat Tunnel: TBM assembly (6 m.)

UTE Trinitat Tunnel: TBM assembly (6 m.)

OHL, Herrenknecht TBM S-424 (6 meters)
Cranes used in the assembly of the TBM:

LTM 1800
LTM 1200

In this case, these two machines to perform static work, since it does not have to scroll load caterpillars.