Four cranes to 220 tons of tree transplanting

Four cranes to 220 tons of tree transplanting

In Donostia-San Sebastian, and three huge redwoods dominate the landscape of Pius XII, competing in the limelight with the source and Amara Plaza hotel. For 45 years these trees have been developed at the institute Peñaflorida plot that was demolished last month to build a new school. The controversy over the [...]

After 5 days of transporting the giant coil reaches Amezketa

After 5 days of transporting the giant coil reaches Amezketa

100 tons is the weight of this huge piece of steel that has dimensions of 7.40 meters high by 6.20 wide. The piece will be used to glaze and dry the paper in a paper company Amezketa.

Special transportation coil, paper Amezketa

Special transportation coil, paper Amezketa

Due to the nature and large size of the cylindrical part, about seven feet high, six wide and one hundred tons, the special purpose vehicle which carries no tunnel can not cross, so that the procession should pass through urban areas. Involved cranes: Liebherr LTM 1500 and Demag AC 250.

Transport demolition machine, Liebherr R-974 model

Transport demolition machine, Liebherr R-974 model

Special convoy carrying demolition machine Lirbherr R-974, working arms and implements.

Mollet work: special transport TITAN CC2000 crane mounting

Mollet work: special transport TITAN CC2000 crane mounting

The works identified in this project, together with the installation of the proposed third lane on the ramp Papiol-Mollet, will allow traffic on this branch of freight and passenger trains both conventional lines as the AVE, guaranteeing access to this branch to new circulations of goods AVE Barcelona-French border and preventing its passage through urban tunnels of Barcelona.