Work Mollet: TITAN special transport CC2000 crane assembly
This is the Knot Mollet, the branch Castellbisbal / Papiol-Mollet Sant Fost, to suit both online traffic AVE as conventional railway lines, as published by the Official State Bulletin (BOE).
The project aims to define the actions necessary to complete the first phase called Mollet knot so as to allow the passage of both circulations AVE rail gauge as in the conventional through so-called Valley corridor (line Papiol - Mollet .)
The works identified in this project, together with the installation of the proposed third lane on the ramp Papiol-Mollet, allow the movement by that branch of freight and passenger trains both conventional lines as the AVE, ensuring access this branch to the new circulation of goods AVE Barcelona-French border and preventing their passage through urban tunnels of Barcelona.























Comments not currently permitted for this content.