UTE The Collada

UTE The Collada

The UTE Lanzavigas working on Collada. It is the transportation from factory 181 60 Ton beams and 6 mounting structures (181 beams and pre-slabs 10,200 m2), 2 with Crane and the rest lanzavigas.

Sevilla Lock UTE

Sevilla Lock UTE

Dredging of 340,000 m3 Dredging Locks Sevilla. Liebherr R974 backhoe and crane model type HS 895 model.

Alternative South Metropolitan Bilbao: "Supersur"

Alternative South Metropolitan Bilbao: "Supersur"

Assembly of metal structures with beams of 40 meters and 250 tons.
Usabiaga has used cranes crane: Liebherr LR 1750 Liebherr LTM 1500, Liebherr LR 1600 (which we see in action in the photo) and other auxiliary cranes

UTE AVE Trinidad: Mount TBM (12 m)

UTE AVE Trinidad: Mount TBM (12 m)

COPASA - ISOLUX CORSAN - VIAS, Herrenknecht TBM S-444 (12m)
The work of unloading, pre-assembly and assembly of the tunnel began in September.
In September we proceeded to the discharge of the TBM S-444 from Germany.
To download use was made of a telescopic truck crane LTM 1400 model with capacity [...]

UTE Quejigares: TBM

UTE Quejigares: TBM

UTE Quejigares: DREDGING - TECSA
Work load consisting of tunnels in the park dredging machinery Valdemoro, subsequent transport of it to work in Salinas (Malaga) before downloading and assembling it.
To do this, we have made use of telescopic crane for loading and unloading both in Madrid and [...]

UTE Metro TBM: TBM dismantling

UTE Metro TBM: TBM dismantling

TBM UTE Metro: FCC - SCRINSER - OHL - FERROVIAL - COPISA.
Work consisting of removal of TBM in Barcelona's El Prat airport to the Metro Line 9 of the said city. In this work made use of the crawler crane LR 1550.

UTE Túnel Terrassa: TBM assembly

UTE Túnel Terrassa: TBM assembly

FCC - OHL - COPISA, Lovat TBM 6 meters
LR 1550 Crane 550-ton crawler crane as principal with telescopic crane to perform the maneuvers held in the assembly.
In addition to cranes, this paper pre-assembly and assembly of TBM were used to transport a truck special [...]

Barreiros Viaduct

Barreiros Viaduct

This is the assembly of several beam structures 40 meters and 200 Ton.
For assembly, makes use of the crane and the crane LR 1550 LG 1550.

Ramp access to boats with a weight of 550 Ton

Ramp access to boats with a weight of 550 Ton

Part Maneuver 550 Ton. in the port of Santander.

Placing a boat ramp to a weight of 550 tons. To do this, use was made models of the cranes Liebherr LR 1750, LR 1280.

Dismantling and transportation of the iron bridge in San Sebastian

Dismantling and transportation of the iron bridge in San Sebastian

Dismantling and transportation of the iron bridge in San Sebastian